6 Jun 2006 16:02
Optimizing resource scheduling
Is there a good way to get efficient resource scheduling? When playing with different "select" modes I got these results: select mode duration -- 168.8 minloaded 140.5 maxloaded 133.6 order 168.8 random 126.7 -------------------- manual 116.7 So it seems even the best automatic scheduling mode (random) gives a duration that is about 10% longer than I get with manual allocation. Is there way to improve automatic scheduling? And will random mode always give the shortest duration? Thanks in advance. Wolfgang Denk
RSS Feed