3 May 17:25
[Trac-dev] Re: tentative 0.12.0 release schedule
From: John Hampton <pacopablo <at> pacopablo.com>
Subject: [Trac-dev] Re: tentative 0.12.0 release schedule
Newsgroups: gmane.comp.version-control.subversion.trac.devel
Date: 2008-05-03 15:25:40 GMT
Subject: [Trac-dev] Re: tentative 0.12.0 release schedule
Newsgroups: gmane.comp.version-control.subversion.trac.devel
Date: 2008-05-03 15:25:40 GMT
Manuzhai wrote: > On Sat, May 3, 2008 at 11:47 AM, Jeroen Ruigrok van der Werven > <asmodai <at> in-nomine.org> wrote: >> My current suggestion: >> >> beta 1 : 2008-10-01 >> beta 2 : 2008-10-14 >> rc1 : 2008-11-01 >> rc2 : 2008-11-14 (as needed) >> release: 2008-12-01 > > I think the cycle could be much shorter for than that. Instead of > aiming to fix everything bug in the tracker, get i18n and > MultipleRepositorySupport (which are supposedly both already in a > fairly usable state), merge them, fix things up (including lots of > small bugfixes, of course), and release in three months. While your timeline is really only about 6 months, which is reasonable for a release, I say let's cut the 0.12 features to i18n and MultipleRepositorySupport and release. I think keeping releases to 2, maybe 3 "features"[1] each is a good thing to keep our release cycle down. -John [1] While I think focusing on two or three features should be the goal, if someone completes a feature that isn't on the the goals, it could be merged. Just it wouldn't be a release blocker. --~--~---------~--~----~------------~-------~--~----~ You received this message because you are subscribed to the Google Groups "Trac Development" group. To post to this group, send email to trac-dev <at> googlegroups.com To unsubscribe from this group, send email to trac-dev-unsubscribe <at> googlegroups.com For more options, visit this group at http://groups.google.com/group/trac-dev?hl=en -~----------~----~----~----~------~----~------~--~---
RSS Feed